Lakeside Landing
SI Precast worked with a local installer to provide equipment for a new lift station. A new cast in place septic tank and lift station was poured onsite. The outlet of the septic system was fitted with 3-10,000 GPD effluent filters. The lift station has Duplex 7.5hp three phase turbine pumps on stainless steel guide rails. These are controlled with a custom Stainless Steel Housing Alderon Control Panel with a cellular signal based remote dialer. It flows through a precast valve vault with ductile iron pipe. The system is secured with lockable aluminum hatches. This wastewater project is a nice addition to the sewer district as they expand the number of residents it serves.
For more information about this project, contact Sean Bauer.